˲Ʊ

Chemical industry professional talent recruitment preferred website

Chemical Talent Network
Individual Registration Business Registration
  • 全职 Job nature: Full-time
  • 不限 Educational requirements: unlimited
  • 不限 Work experience: unlimited
  • 不限 Professional requirements: unlimited
  • 不限 Foreign language requirements: unlimited
  • 4000~8000 元/月 Salary: 4000 ~ 8000 yuan / month
  • 不限 Title requirements: unlimited
  • 若干 Number of Recruitment: Several
  • 2019-11-29 ~ 2020-10-30 Date of recruitment: 2019-11-29 ~ 2020-10-30

Job Responsibilities

1) Participate in the preparation of “three investigations and four determinations” documents for coal-to-gas plants;

2) Participate in the "three investigations and four determinations" of coal gas plant;

3) Participate in the preparation of documents such as purge / cleaning / replacement / gas tightness of coal gas plants;

4) Participate in the joint commissioning of coal-to-gas plants;

5) Participate in the preparation and commissioning of coal gas plant;

6) Participate in the preparation of performance assessment schemes for coal-to-gas plants;

7) Responsible for the preparation and reporting of the material preparation plan for coal-to-gas installations;

8) Responsible for the preparation of technical training documents for coal gas plant employees;

9) Responsible for on-site learning and simulation training of employees;

10) Responsible for technical evaluation of production practice for new employees of coal-to-gas plants;

11) Responsible for the preparation of technical regulations for coal gas plant;

12) Responsible for the preparation of the operation manual of coal gas plant;

13) Responsible for the preparation of process cards for coal gas plants;

14) Responsible for the preparation of emergency plans for coal-to-gas plants;

15) Responsible for the preparation of the technical plan of the coal gas plant;

16) Responsible for the preparation of the commissioning plan of the coal gas plant;

17) Responsible for the preparation of emergency plans for coal-to-gas plants.

contact details

  • The company has set up confidentiality, please apply through the system.
Scan code
Has HR seen my resume?
Will I be notified of the interview?
Scan and stay informed >>

Latest salary quotes for Instructor / Associate / Operator positions in Inner Mongolia

Chifeng Qihui Aluminum Development Co., Ltd.

Chifeng Qihui Aluminum Development Co., Ltd. plans to construct an alumina project in the Marin Industrial Park of Chifeng City. The total investment of the project is 17 billion yuan, and the construction scale is 6.5 million tons / year of alumina. The imported bauxite is used as the main raw material and the Bayer process is used to produce metallurgical sandy alumina. Two high-temperature production lines and three low-temperature production lines have a single line capacity of 1.3 million tons per year. The project includes alumina production facilities and auxiliary facilities. After completion, it will become the world's most technologically advanced and largest single alumina company, and will become a landmark project in the global aluminum industry.

Latest Jobs at Chifeng Qihui Aluminum Development Co., Ltd.

Join the high-end talent pool and enjoy professional high-end talent services
Industry Finding Mobile Apps
a